  • We have been involved in the design, fabrication and mechanical installation for a number of projects at Red Stag for the new Mega Mill project commissioned on the 23rd March 2017....

  • Sling sorter installed and stacker tilt hoist infeed and outfeed provided Donelley’s with improved utilisation of the existing bin sorter by giving them the ability to dry sort after kiln drying without tying up the green mill bin sorter....

  • Due to an increased demand on the existing dispatch plant, we were engaged to manufacture and install a new dispatch plant capable of delivering xxx tonnes per hour of product....

  • We design, manufacture and export hydraulic kiln pushers for continuous kilns and kiln trollies for Mahild’s clients throughout the world....

  • Designed, manufactured and installed the complete plant, including the main structures, erected the tilt slab panels for the bunkers, installed feedstock screws and conveyors feeding to the pellet plant and commissioned the plant. ...

  • Installed a Precision Husky High Volume 20’ x 10’ chip screen to replace the KNW screen to handle the increasing chip volume required of the mill. The screen was installed over the Easter break to minimise the downtime for the mill and was completed on time and within specification....

  • Designed and fabricated screen support frames for the Metso vibrating screens supplied by MIMICO for Isaac’s new sand processing plant at their McLean’s Island site near Christchurch....

  • Designed and upgraded the Tray Sort Line, this project involved removing the old line over the Christmas period, installing the new line which comprised of a singulator, unscramblers, decline transfer deck, speed up chains, surge deck, tier former, and modifications to the anti-sap spray box. The upgrade has provided an increase in uptime and production throughput for the green mill and was completed on schedule....

  • Designed, fabricated and installed (using ecologically friendly engineering) the main platform with spiral staircase and a series of connecting suspension bridges (totalling 553m) and living decks/rings in the Redwoods Forest in Rotorua....

HEALTH & SAFETY COMMITMENT

Lakeland Steel Limited considers people safety and health protection, safety in regard to operations, customer satisfaction and listening to stakeholders as paramount priorities.
Lakeland Steel Limited has a Health & Safety management plan in place and a dedicated representative whose responsibility is to ensure compliance is maintained. We strive to comply with applicable laws and regulations. All of our staff at Lakeland Steel Limited are made fully aware of our H&S policies and procedures and we work with them to continuously update and improve.